Monday, July 20, 2009
Shop Interior Design | Juwelry Mayrhofer, Linz,Austria | xarchitekten
Juwelry Mayrhofer, Linz, Austria
2001-08
Text: xarchitekten
Pictures: Max Nirnberger, Lorenz Prommegger
Location: Hauptplatz 22, 4002 Linz, Austria
Client: Mag Michael Mayrhofer
Direct order: 2000
Start of construction: 2001
Handing over Phase I: 2001; Phase II: 2004; Phase III: 2008
Built-up area: 81 m2; Floor space: 55 m2
Substance: Mixed Stonewall, set with stone pillars
partially under cultural patrimony
arched brick ceiling
irregularly positioned niches
Space Shell: Floor-Wall-Ceiling-Continuum:
Wooden rip construction, axial distance 35 cm
2-part armed RIGIFORM - panelling
Carpet surface on Floor-Wall-Ceiling
The shell was developed, planed and produced in 3D models on different scales (consistent planning).
As support for the constructive realization, the floor plan was printed in 1:1 scale
and put on the construction site.
Furniture: surfaced wood
hidden armature, automatic closing device
Via